Checking the parts list – Powerware 208/120V User Manual

Page 14

Advertising
background image

INSTALLATION

EATON Powerware

®

Energy Management System (EMS) Upgrade Kit User’s Guide

S

164201724 Rev 1

www.powerware.com

8

Checking the Parts List

Verify that the following items are included with the EMS−UGK.

All models

Electronics module (display optional)

Mounting bracket (installed on electronics module)

EMS Configuration Tool CD for setup and calibration

EMS configuration cable (DB−9 to RS−232 serial)

This user’s guide

Power Xpert Gateway Series 1000 Card (installed on electronics module)

Card configuration cable (RJ−45 to RS−232 serial)

Ethernet cable

Power Xpert Gateway Series 1000 Card registration card

Power Xpert Gateway Series 1000 Card Quick Start Instructions

NOTE For more detailed information, download the Power Xpert Gateway Series 1000
Card User’s Guide from the Documentation page on the Power Xpert card once the card
is accessible on the user’s network or from www.eaton.com/powerxpert.

All models (for each panel ordered)

(2) Branch circuit harnesses, each with one 28−position circular connector and
21 two−position connector plugs

(44) Branch current transformers (CTs), split−core, 75A, 1V output, with two−position
connector receptacle (includes 2 spares) (optional)

(1) Voltage harness, with one 7−position circular connector, three spade connectors
(A, B, C), and two ferrule connectors (Neutral, Ground)
NOTE Dual panel option only. Voltage harness V2 does NOT include a connector for
Ground.

(10) Wire taps:
− (5) 4.0 mm

2

(12 AWG), yellow

− (5) 0.75–2.5 mm

2

(18–14 AWG), blue

(3) Wire tap transition harnesses, each with a quick disconnect receptacle and a ferrule
connector