INSTALLATION

EATON Powerware

®

Energy Management System (EMS) Upgrade Kit User’s Guide

S

164201724 Rev 1

www.powerware.com

9

Main input monitoring option only (one set for each panel if ordered)

(1) Main input harness, with one 28−position circular connector and five 2−position
connector plugs (A, B, C, Ground, Neutral)

(4) Main CTs, split−core, 400A, 1V output, with 2−position connector receptacle

(1) Input ground CT, split−core, 100A, 1V output, with 2−position connector receptacle

Conduit box option only (if ordered)

Conduit box, left side

Conduit box, right side, with installed DB−9 extender cable

Subfeed Accessory Kit only (if ordered)

(3) Subfeed transition harnesses, each with 2 two−position connector plugs

(3) Branch CTs, split−core, 400A, 1V output, with two−position connector receptacle

100A Split−Core CTs Accessory Kit only (if ordered)

(10) Branch CTs, split−core, 100A, 1V output, with two−position connector receptacle

75A Split−Core CTs Accessory Kit only (if ordered)

(5) Branch CTs, split−core, 75A, 1V output, with two−position connector receptacle

NOTE Accessory kits may be shipped in separate cartons.

Tools Required

To assemble the components, the following tools may be needed:

S

Phillips

®

#2 screwdriver

S

Pliers or other appropriate tool for installing wire taps

S

Drill or other appropriate tool for installing customer−supplied wall
anchors