Testing failover, Failover manual intervention – HP Storage Mirroring V5 Software User Manual

Page 149

Advertising
background image

11

-

15

Testing failover

The failover process, including pre-failover and post-failover script processing, can be tested at any time. To force
unavailability, disconnect the network cable from a monitored machine, wait for the

Time to Fail

counter to decrease to zero

and failover begins. To avoid the countdown delay, highlight the monitored machine name in the Failover Control Center
window and select

Failover

.

Failover manual intervention

The

Require User Intervention to Initiate Failover

option generates a prompt through the Failover Control Center. The

prompt directs the administrator to click

OK

to proceed with the failover or

Cancel

to cancel the failover process. Failover

can be initiated when appropriate from the Failover Control Center

NOTE:

Remove the source from the network before testing failover. If the source is still on the network, an IP address
conflict will occur.

NOTE:

If the Failover Control Center is not running when a failure occurs, the manual intervention dialog box will
appear the next time the Failover Control Center is started.

When a failure occurs, an alert is forwarded to the Linux system log. You can then start the Failover Control
Center and respond to the Manual Intervention Required prompt.

If SNMP is installed and configured, an SNMP trap is also generated. When using a third-party SNMP manager,
an e-mail or page can be generated to notify you of the failure.

Advertising
This manual is related to the following products: