Figure 3-2 Procedure Flowchart (2 of 2)

The mark shown below is attached to the NAP sheet for each procedure in which circuit cards are handled. When
doing such a procedure, the installer must perform the procedure with caution, to prevent damage caused by stat-
ic electricity (

See section 1.2

, “Static Electricity Precautions” in this chapter).