Figure 284. BESTlogicPlus Settings (Vx Third Harmonic Mode)

Step 3: Use BESTCOMSPlus to open the Protection, Voltage, Undervoltage (27X-1) screen and send

the first row of test settings in Table 152 to the BE1-11g.

Table 152. Pickup Test Settings (Vx Third Harmonic Mode)

Pickup Setting

Time Delay

115 V

50 ms

65 V

50 ms

20 V

50 ms

Step 4: Prepare to monitor the 27X-1 function operation. Operation can be verified by monitoring OUT2

(see Figure 284).

Step 5: Connect and apply a single-phase, 120 Vac, 3

rd

harmonic voltage source to the Vx input,

terminals C17 (polarity) and C18 (non-polarity).

Step 6: Slowly decrease the voltage until OUT2 closes and record the pickup. Verify that there is a 27X-

1-3RD target on the front-panel display. Slowly increase the voltage until OUT2 opens and
record the reset. Reset the target.

Step 7: Verify the pickup and reset accuracy at 70 Vac for a pickup setting of 65 V and 25 Vac for a

pickup setting of 25 V as listed in Table 152. Record the results.

Step 8: (Optional.) Repeat steps 1 through 7 for the B-phase and C-phase voltage inputs.

Step 9: (Optional.) Repeat steps 1 through 8 for settings group 1, 2, and 3.

Step 10: (Optional.) Repeat steps 1 through 9 for 27X-2, 27X-3, and 27X-4.

Timing Verification (Vx Third Harmonic Mode)

Step 1: Use BESTCOMSPlus to open the Protection, Voltage, Undervoltage (27X-1) screen and send

the first row of test settings in Table 153 to the BE1-11g for settings group 0.

Table 153. Timing Test Settings (Vx Third Harmonic Mode)

Pickup Setting

Time Delay

115 V

2,000 ms

115 V

5,000 ms

115 V

10,000 ms

Step 2: Prepare to monitor the 27X-1 timings. Timing accuracy is verified by measuring the elapsed

time between a sensing voltage change and OUT1 closing.

Step 3: Connect and apply a 120 Vac, single-phase, 3

rd

harmonic voltage source to terminals C17

(polarity) and C18 (non-polarity).

Step 4: Step the voltage down to 110 volts. Measure the time delay and record the result.