Power cable management, Hard disk drive – HP DL120 User Manual
Page 36
Removal and replacement procedures 36
Power cable management
Item
PSU cable label
Connects to
1
P1
PWR_CN on the
system board
2
P2
CN4 on the system
board
3
P3
Optical disc drive
4 P8
2
nd
hard drive
5 P9
1
st
hard drive
Hard disk drive
Hard drives installed in the server are labeled as HDD 1 and HDD 2, from left to right, when viewed
from the front of the server.
The drive bays can accommodate large form factor (LFF) non-hot-plug SAS or SATA hard drives. The
following drive capacities are supported.
•
Non-hot-plug SAS HDD – 72-, 146-, and 300-GB
•
Non-hot-plug SATA HDD – 80-, 160-, 250-, 500-, and 750-GB
IMPORTANT: SAS hard drives require that you first install the SAS controller board and SAS
HDD/LED cable option kits. For instructions on how to install these option kits, go to page 61.