Assembly instructions, Parts list – Foundations 100-EVBP User Manual

Page 2

Advertising
background image

1

ADULT INSTALLATION REQUIRED.
TOOLS REQUIRED:

Level (A)

Measuring tape (B)

Power drill with 7/32”, 1/8” and 1/2” masonry bits (C)

Power screwdriver with bull nose phillips bit (D)

READ ALL INSTRUCTIONS BEFORE ASSEMBLY OF Diaper Changing Station.

Unpack carton and identify all parts.

ASSEMBLY INSTRUCTIONS

Parts Description

Quantity

Hardware for installation:

3” Wood Screws

4

3/4” Finishing Washers

4

3” Machine Screws

2

3/4” Flat Washers

4

Toggle Anchors

2

1-1/4” Caps

6

Door / Wall Plate

1

3” Wood Screws

PARTS LIST

3/4” Finishing Washers

3” Machine Screws

3/4” Flat Washers

Toggle Anchors

1-1/4” Caps

30.5”

(775 mm)

19.5”

(495 mm)

32”

(813 mm)

For Wood Studs:

3/4” Flat Washers

For Use With Toggle Anchors:

A.D.A. Compliance:

4.4.1 Maximum Protruding Objects

4.2.5 Forward Reach

4.2.6 Parallel Approach

4.27.4 Operation

Compliant when properly installed.

Door / wall plate to be

mounted on outside of

restroom door.

A

B

D

C

IMPORTANT NOTE:

The EZ Mount

Backer Plate may or may not be included with the model you purchased. The backer

plate is intended to reduce installation time and costs as well ensure connection to two studs. Safe

installation can also be achieved without the use of the backer late by following the instructions

provided.
If your model did not include an EZ Mount

Backer Plate and you have determined that you would

like to purchase one, please contact us at 1-877-716-2757 if you have any questions. The part

number is A100-BPEV.

Advertising