Multiple panel installations, Solar zones and gate activity, Solar panels connect in parallel – GTO FM121 User Manual

Page 4

Advertising
background image

4

Winter Ratings

Zone 1 Zone 2 Zone 3

Single gate installation with 5 Watts of charging power

4

8

13

Single gate installation with 10 Watts of charging power

8

16

26

Single gate installation with 20 Watts of charging power

14

28

38

Single gate installation with 30 Watts of charging power

20

44

54

Dual gate installation with 10 Watts of charging power

4

8

13

Dual gate installation with 20 Watts of charging power

10

18

27

Dual gate installation with 30 Watts of charging power

16

28

41

Zone 1

Zone 2

Zone 3

Zone 3

Zone 3

Multiple Panel Installations

Use the table and map to determine the

number of operational cycles* per day

to expect in your area, using 5 to 30

Watts of charging power. Figures are

shown for winter (minimum sunlight)

and do not account for the use of any

accessory items.

Solar Zones and Gate Activity

Estimated Gate Openings Per Day

NOTE: All connections should
be weather proofed using weather
proof splice kits avilable at hard-
ware and electrical supply stores.

All dual gate installations require a minimum of 10 Watts of solar charging power.

RED

RED

BLACK

BLACK

attach BLACK to negative (–) solar terminal on control board

attach RED to positive (+) solar terminal on control board

Solar Panels connect in PARALLEL

Accessories will draw additional power from the battery; the more

accessories you connect, the more power your system will require.

We recommend that you purchase an extra 12V, 7 amp hour battery

(RB500) for the FM500/502, SW2500/2502, SW3000XL/3200XL,

SW4000XL/4200XL

*An operational cycle is one full

opening and closing of the gate.

*Number of openings per day will

depend on the length, weight, hard-

ware and environmental conditions.

Advertising