IBM PC Server/Enterprise Racks 42S User Manual
Page 171
Advertising
NetBAY Power Distribution Units
163
Figure 74. Installing the vertical mounting plate and cable-management bracket
5.
Install the cable-management bracket
c1d beside the vertical mounting plate with
four M6 screws and nuts that come with this option.
6.
Route the fixed line cords down, towards the rack side braces; then, route the line
cords along the side brace towards the back of the rack cabinet and secure them
with the cable straps that come with this option.
Figure 75. Routing the fixed line cords
1
1
2
2
3
3
MAIN
MAIN
Advertising
This manual is related to the following products: