Column lock handle, Table installation, Head assembly – Jet Tools Jet Drill Press JDP-15M/MF User Manual

Page 9: Chuck and arbor installation

Advertising
background image

9

Figure 4

Column Lock Handle

Referring to Figure 5:

Thread the column lock handle (D) into the table
bracket (E).

Figure 5

Table Installation

Referring to Figure 6:

1. Place

the

table (A) on the bracket (B).

2. Tighten

the

table lock handle (C).

Figure 6

Head Assembly

Referring to Figure 7:

1. With the aid of a second person, carefully lift

the head onto the column top and slide it
down into position

The head assembly is heavy! Use care when
lifting onto the column!

2. Rotate head assembly until sides of the

pulley cover are parallel with the sides of the
base.

3. Tighten two setscrews (A) with a 5mm hex

wrench (provided) until they are snug.

Figure 7

4. Install three downfeed handles (B) into the

downfeed hub (C).

Chuck and Arbor Installation

Referring to Figure 8:

1. Twist the chuck (B) to retract the chuck jaws

if they are exposed.

2. Install the chuck (B) to the arbor (A) tightly.

3. Insert the chuck and arbor assembly into the

spindle (C). Pull the downfeed handle down
to press the arbor in place.

Note: Put a piece of scrap wood (D) on the table
to protect the chuck nose when pulling the
downfeed handle (E) down to press into place.

Advertising