Kobe Range Hoods CH8136SQ User Manual

Page 6

Advertising
background image

4

INSTALLATION

PLEASE READ ENTIRE INSTRUCTIONS BEFORE PROCEEDING

Calculation before installation

To calculate the length of the installation, please refer to Table 1. (All calculation is measure in

inches.)


TABLE 1

A = Height of Floor to Ceiling

B = Height of Floor to Counter Top

(Standard: 36”)

C = Preferred Height of Counter Top

to Hood Bottom (Recommended

27” to 30”)

D = Height of Hood

E = Height of Duct Cover [F – D]

F = Height of the Hood Installation

[A – (B+C)]

SAFETY W A RNIN G

HOOD MAY HAVE VERY SHARP EDGES; PLEASE WEAR PROTECTIVE GLOVES IF IT

IS NECESSARY TO REMOVE ANY PARTS FOR INSTALLING, CLEANING OR

SERVICING.

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE

VENT OPENING.

- Decide the location of venting pipe from the hood to the outside. Refer to Figure 1.

- A straight, short venting run will allow the hood to perform more efficiently.

- Try to avoid as many transitions, elbows, and long run as possible. This may reduce

the performance of the hood.

- Use duct tape to seal the joints between pipe sections.

- Temporarily wire the hood to test for proper operation before installing.

Advertising