Polycom SVP010 User Manual

Page 21

Advertising
background image

Installing the SpectraLink 8000 SVP Server

PN: 1725-36031-001_H.doc

21

Mount the SVP Server to a wall

The SVP Server can be mounted either horizontally or vertically.
To mount the SVP Server to a wall:
1. Using a 1/8-inch drill bit, drill four pilot holes, on 1.84-inch by

12.1-inch centers (approximately equivalent to 1-13/16” by
12-1/8”).

2. Insert the #8 3/4-inch screws in the pilot holes and tighten,

leaving a 1/8-inch to 1/4-inch gap from the wall.

Grounding Instructions



Safety

Warning

The metal chassis of this unit may contain leakage currents (i.e.,
"touch" current) which is cumulative when multiple units are
connected together to form a system. To prevent the summation of
leakage currents from being present on exposed metal surfaces, the
following installation procedure must be followed.

All system units must be grounded to a protective earth by means of
the grounding stud located on the rear panel. Refer to the illustration
below for recommended continuity connection.

No more than 15 units may be grounded through one connection to
the protective earth ground. Systems involving more than 15 units
must be broken up into groups of 15 or fewer units with each group
provided with an independent protective earthing conductor.

Advertising
This manual is related to the following products: