Powerware 685 User Manual

Page 20

Advertising
background image

14

Powerware 9350 Series 685 and 1085 Auxiliary Battery Cabinets

Installation Manual

164201408 Rev. P00 053002

Nut from kit

Front of 1085

Battery Cabinet

Bracket from kit

Front of

UPS

Nut from kit

Existing hinge

Ground Wire

Ground Stud

TOP VIEW

FRONT VIEW

Figure 8. Attaching UPS Base to Series 1085 Base

12.

Route the ground wire (from the field kit) from the customer ground stud in the

battery cabinet, under the lower right-hand battery tray, through the access

hole in the side panel of the UPS, and attach to customer ground stud in the

UPS cabinet. Hardware is provided on each ground stud.

13.

Repeat Steps 2 through 12 to attach additional Series 1085 Battery Cabinets to

the other side of the first battery cabinet. Level the cabinets with the leveling

screws.

14.

Locate the cabinet connecting bracket from the field kit. Attach the bracket to

the lower right-hand side of the Series 685 base using 2 M4 screws.

15.

Locate the large flat bracket from the field kit. Place one end of the bracket

over the stud on the bottom side of the UPS cabinet lower right-hand hinge,

and the other end over the stud on the bottom side of the lower right-hand

hinge on the Series 685 Battery Cabinet (see Figure 9).

16.

Attach the bracket to the hinges with two M8 self-locking nuts from the field kit.

Advertising
This manual is related to the following products: