To configure required and optional system settings:

1.

Verify the EMS−UGK is physically connected to all installed CTs.

2.

Verify that main voltages are connected and the EMS−UGK is
powered on.

3.

Click Start > Programs > EATON > EMS Configuration Tool to open the
configuration tool. The System Status page displays, as shown in
Figure 14.

Figure 14. System Status Page (Not Connected)

4.

Click Connect to establish communication with the EMS−UGK.