Advanced metering installation – Powerware 208/120V User Manual

Page 42

Advertising
background image

INSTALLATION

EATON Powerware

®

Energy Management System (EMS) Upgrade Kit User’s Guide

S

164201724 Rev 1

www.powerware.com

36

Advanced Metering Installation

The Power Xpert Gateway Series 1000 Card (shown in Figure 16) is
factory−installed in the X−Slot communication bay on the side of the
EMS−UGK electronics module.

To connect the cables and configure the card:

1.

Locate the Power Xpert Gateway Series 1000 Card Quick Start
Instructions included with the EMS−UGK.

2.

Perform all the steps in the quick start instructions, ignoring the
initial few steps that describe how to install the card in a PDU.

The quick start instructions direct you to:

S

Connect the Ethernet cable

S

Connect the configuration (serial) cable

S

Configure IP Address assignments

3.

For more detailed information about installing the card or using
Advanced Metering, download the Power Xpert Gateway Series
1000 Card user’s guide from the Documentation page on the Power
Xpert card once the card is accessible on your network or from
www.eaton.com/powerxpert.

Ethernet
Port 2

Ethernet
Port 1

Configuration
(Serial) Port

Figure 16. Power Xpert Gateway Series 1000 Card

4.

Conduit Box option only. If a right conduit box is installed, reinstall the
top plate on the right conduit box.

Advertising
This manual is related to the following products: