Green bag – Vision Fitness ST730 User Manual

Page 12

Advertising
background image

12

4

STEP

• Attach the bearing tubes (AF2) to the over-
head lat arm (AC2) with four bolts (M6x15).

• Lift the overhead lat arm (AC2) and set
atop the upright frame (AG1) and the brackets
in the weight stack tower (AB1). Slide two
bolts (M10x98) with two flat washers
(10.2x22x2) up through each bracket on
weight stack tower and secure with two flat
washers (10.2x22x2) and two nylon nuts
(M10). Secure to top of upright frame by
sliding two bolts (M10x95) with two flat
washers (10.2x22x2) down through holes in
overhead lat arm. Secure with two flat washers
(10.2x22x2) and two nylon nuts (M10).
Tighten all hardware.

GREEN BAG

AB1

AB1

AC2

AC2

AF2

AF2

AG1

AG1

Advertising