Veris Verabar V100 User Manual

Page 4

Advertising
background image

5.4

Insert Instrument Valves or Manifold

5.4.1 Valves

If the Verabar does not have a valve head, install
instrument valves using proper thread sealant. Be sure
instrument shut-off valves are installed and shut prior to
repressurizing the pipe.

5.4.2 Manifold

If the Verabar has a direct or integral manifold, be sure
the high and low pressure block valves are shut off prior
to repressurizing the pipe.

The Verabar is now properly installed (Figure 5).
























Figure 5. Installed V100

Periodic Maintenance

The assembly should be periodically checked. Verify
that no leaks are present.












6315 Monarch Park Place

Niwot, CO 80503 USA

Phone: (303) 652-8550

IO

-100 VWI-CS-020 REV B (6/08)

Fax: (303) 652-8552

Email: [email protected]

Website: www.veris-inc.com

Printed in USA

Advertising