Veris Technologies OpticMapper - Operating Instructions User Manual

Page 12

Advertising
background image

Pub.# OM17-OpticMapper

3-2

Electro-hydraulic Lift Kit Set-up


The Electro-hydraulic Kit is shipped in a pre-assembled state, and has been tested prior to
shipment.

Figure 4 Hyd Power Unit

Installation:


1) Locate power unit in desired location in towing vehicle. If the unit is to be used on a dedicated

unit, we advise anchoring it securely to prevent tipping or damage in rough field conditions.
Mounting holes are located on each side of base.

2) Connect ground (black) power cable to negative post on towing vehicle battery.
3) Connect power (red) cable directly to the positive post on the battery. Quick connect to power

unit.

4) Remove the shipping plug from the reservoir and install breather cap. ( a plug will be installed if

shipped via UPS).

5) Lower implement to the surface and remove ratchet jack. (Note: Cylinder may have been

previously installed at factory).

6) Connect hoses to power unit. Note that the quick couplers are labeled for proper connection.
7) Install the cylinder to the implement as shown below, with the rod end to the rear and the

cylinder barrel in the lower position; with the hose fittings outward from the center.

Figure 5

Advertising