J&M GC-24T Assembly User Manual

Page 19

Advertising
background image

GC24

t

-1 G

rain

C

art

a

ssembly

-19-

STEP - 36

STEP - 35

Using an overhead hoist, lift the bottom tube assembly using the lifting hook holes. This should help

set the appropriate angle for laying the assembly into the tank.

Using an overhead hoist, lift the bottom tube assembly into the front left corner of the grain

cart. Lower the bottom tube assembly until the two corners that are circled in the figure to the

right to go below the tank assembly. Then raise the lower auger back up so that the two circled

corners can be bolted to the tank. Attach using (25) M10 x 25 MM serrated hex head bolts and

(25) M10 serrated hex nuts. Use a drift pin as needed to help line up the holes accordingly.

The bottom tube needs to rest on

the outside of the corner piece that

is attached to the rails.