Gardner Bender CP80 Floor Mount Assembly User Manual

Instruction sheet cp80 floor mount assembly, Gardner bender, Floor mount installation

Advertising
background image

Prior to installing the CP80 Floor Mount, be sure to
establish what concrete pad specifications are required.
Contact a qualified structural or civil engineer. Concrete
mounting pad must be a minimum of 3,000 psi rated.

Concrete wedge anchors are provided with the CP80
Floor Mount. To avoid injury, follow the anchor
manufacturers instructions. The four (4) wedge-style
anchors are

3

4

” x 6”.

Do not exceed the Puller maximum pulling capacity of
8,000 lbs. Watch the Puller force gauge to be constantly
aware of the level of force being generated during the
cable pull process.

During pulling operations, no one is permitted to stand
directly in line of pulling rope which is under tension.

Floor Mount Installation

Drilling Holes

1. Position the CP80 Floor Mount in the location desired.

Be sure the narrow end of the frame is facing toward
the conduit. See figure 2.

2. Once the frame is in position, use the four mounting

holes as a template to mark the location for
drilling holes.

3. Anchor bolts are wedge-style (

3

4

” x 6”). Drill 4 holes.

a. Drill four holes perpendicular to the work surface

using a bit with a diameter equal to the anchor
diameter. Drill the hole to a depth exceeding
minimum embedment, but not closer than two
anchor diameters to the bottom or opposite concrete
surface. Through drilling may be allowed when using
sleeve anchors in hollow concrete block. TO
ENSURE FULL HOLDING POWER, DO NOT
REAM THE HOLE OR ALLOW THE DRILL TO
WOBBLE. See figure 3(a).

IMPORTANT: RECEIVING INSTRUCTIONS: Visually inspect all components for shipping damage. If any shipping
damage is found, notify carrier at once. Shipping damage is NOT covered by warranty. The carrier is responsible for
all repair or replacement costs resulting from damage in shipment.

Gardner

Bender

Instruction

Sheet

CP80

Floor Mount

Assembly

IMPORTANT USER SAFETY AND PROTECTION: In setting up systems to fit your operations, care must be taken to
select the proper components and design to insure appropriate integration with your operations and existing
equipment and that all safety measures have been taken to avoid the risk of personal injury and property damage
from your application or system.

GB ELECTRICAL, INC. CANNOT BE HELD RESPONSIBLE FOR DAMAGE OR INJURY CAUSED BY UNSAFE
USE, MAINTENANCE OR APPLICATION OF ITS PRODUCTS.
Please contact GB's technical service department
for assistance if you are in doubt as to the proper safety precautions essential to designing and setting up your
particular application.

JETLINE

Figure 1

Figure 2

Toward

Conduit

Advertising