Qualcraft Stacker Bracket Frame User Manual

Page 18

Advertising
background image

Prior to Disassembly:

Ensure all necessary carpentry is complete, including: 1) All roof vents and frieze blocks installed;
2) All fascia completed; 3) All roof sheeting and railing done; 4) Fireplace stacks, pop-outs,
skylights, dormers, and all other protrusions from surface are complete; 5) Holes cut for heat;
6) Chevrons at gable ends; 7) Tile kick at eve installed.

Disassembly:

1. Ensure caution tape or other sufficient barrier is in place around the entire applicable work
area.

2. Ensure sufficient and proper fall safety equipment is used during disassembly.

3. Remove all Guardrails, Scaffold Planks, and Guardrail Posts. ALWAYS perform disassembly work
in the opposite direction of installation.

4. Stack all boards, planks, and Guardrail Posts on properly installed roof jacks, or safely lower all
materials to the ground. DO NOT OVERLOAD ROOF JACKS.

5. At sheer wall locations, attach compatible rope or webbing to previously installed Lowering
Strap. While another worker firmly holds the Lowering Strap, loosen Top Clamp Eyebolt and
remove Top Clamp. Lower Support Bracket to ground using selected rope or webbing.

6. For non-sheer wall locations, remove 3’, 2” x 4” Support Brace. Loosen Top Clamp Eyebolt,
remove Top Clamp, and bring Support Bracket onto the roof between the studs. Safely lower all
materials to the ground.

Rail Clamp

Hanger Bracket Post

Outrigger

Hanger Bracket

G

ua

rd

ia

n

Fa

ll

Pr

ot

ec

tio

n

6

30

5

S.

2

31

st

S

t.

, K

en

t,

W

A

9

80

32

p

ho

ne

: (

80

0)

4

66

-6

38

5

f

ax

: (

80

0)

6

70

-7

89

2

w

w

w

.g

ua

rd

ia

nf

al

l.c

om

16

Advertising