In-Situ Virtual HERMIT Pump Test Kit Quick Start Guide User Manual

Using the virtual hermit, Pump test kit, Overview

Advertising
background image

Using the Virtual HERMIT

®

Pump Test Kit

Overview

Virtual HERMIT software is used with Level TROLL

®

700 instruments and the

TROLL

®

Net hub to set up instruments and collect data from pump tests.

Up to 16 Level TROLL instruments can be connected to each “HERMIT”

but there is no limit to the number of HERMITs each pump test can have.

With this software, all instruments can be set up identically and can begin

monitoring the pump test simultaneously.

Required Equipment

Rugged TROLL Net hub

Level TROLL 700 instruments from In-Situ Rentals

RuggedCable

®

system with Twist-Lock connectors (1 for each

instrument and 1 for the TROLL Net hub)

Serial TROLL

®

Com programming cable for use with the

RuggedReader

®

handheld PC

USB TROLL

®

Com programming cable for use with a laptop PC and

RuggedCable

®

system

Virtual HERMIT software (on enclosed CD)

Cable Connections

Set Up a Pump Test

Connect all the Level TROLL instruments to the TROLL Net hubs.

1.

Install the Virtual HERMIT software from the CD.

2.

Open the software.

3.

From the Main screen, click the Create New button.

4.

Click Pump Test, in the top left window.

5.

Click the Edit button to name or rename the pump test. Click the

6.

Check Mark button to save the pump test name. Then click the Add

HERMIT button to add the needed number of “HERMITs”.

Click a HERMIT branch in the navigation tree to edit your settings

7.

for that particular HERMIT. The HERMIT Summary tab will appear.

Click the Edit button to name the HERMIT. Click the Check Mark

button to save the HERMIT name.

Click the Add/Find TROLLs button to configure your Level TROLL

8.

using the Probe Setup Wizard. Select Search for one or more Level

TROLLs on an existing network.

Click the Forward arrow.

Select “Search for TROLLs”. The software will configure the sensors.

9.

It doesn’t matter which TROLL goes to which port.
When all the Level TROLL instruments have been configured, you

10.

will return to the main screen. Click the Connect button.

Bulkhead cable connectors on both sides

Master cable connector on bottom

Advertising
This manual is related to the following products: