Important – GE ZV900SLSS User Manual

Page 15

Advertising
background image

15

Installation Instructions

,167$//$7,21³5(&,5&8/$7,1*

DUCTWORK, WIRING LOCATIONS

• Determine the exact location of the vent hood.
• Locate the template packed with the literature.
• Measure 36

d

from the floor to the top of the cooking

surface. Add hood installation height determined on

page 7. Mark that location.

• Tape the template in position along the penciled line.

CHECK TO BE SURE THE TEMPLATE IS LEVEL.

• Use a level to draw a line straight up, from the

centerline on the template to the ceiling.

HOUSE WIRING LOCATION:

• The junction box is located on the top left side of

the hood.

• Wiring should enter the back wall at least 22

d

above the bottom of the hood, and within 6

d

of the centerline.

1 INSTALL FRAMING FOR HOOD

SUPPORT

IMPORTANT:

Framing must be capable of

VXSSRUWLQJOEV

If drywall is present, mark the screw hole locations for

the top mounting brackets. Remove the template.
• Cut away enough drywall to expose 2 vertical studs

at the bracket location indicated on the template.

• Install a horizontal support at least 1" x 6"

between two wall studs at the bottom mounting

bracket installation location. The horizontal support

must be flush with the room side of the studs.

Use cleats behind both sides of the support to

secure to wall studs.

• Reinstall drywall.

Ceiling

Centerline of

installation

space

View from rear

cleats

1” x 6” min.

mounting

support

Advertising