LBL Lighting 2-Circuit MO Element Adapter User Manual

Two-circuit monorail fusion jack adapter, Installation instructions for, Circuit monorail 1a 1b

Advertising
background image

Installation Instructions for

Two-Circuit Monorail Fusion Jack Adapter

1.0

PENDADAPMONOFJ2_

980MR2FIXC

G

P

I

:

ENERAL

RODUCT NFORMATION

This product is ETL listed and suitable only for indoor dry locations

and approved for use at any height above the finished floor.

This product is intended to be used with LBL 2-Circuit Monorail

system.

1

Install the Adapter onto the 2-Circuit
Monorail for Down Light Fixtures

Push and screw the fixture Fusion Jack completely into the

Fusion Jack adapter.

FIXTURE
FUSION JACK

FUSION JACK
ADAPTER

To power up the fixture from circuit #1, tighten the M3 set

screw on top of the cap with the 1.5MM Allen wrench. Make

sure that the set screw is tight for proper power

connection.

M3 SET SCREW

1.5 MM ALLEN

WRENCH

CIRCUIT #1:
COMBINATION
OF THESE RAILS

M3 SET SCREW

CIRCUIT #2:
COMBINATION
OF THESE RAILS

To power up the fixture from circuit #2, remove the M3 set

screw from top of the cap and screw it into the side of the

Fusion Jack adapter hole with the 1.5MM Allen wrench. Make

sure that the set screw is tight for proper power

connection.

NOTE:

Never use more than one set screw to select

a circuit on the Fusion Jack adapter.

NOTE:

Do not load either circuit over the maximum

system rating.

1.5 MM ALLEN

WRENCH

Unscrew the cap from the Fusion Jack adapter.

Select a place on the 2-Circuit Monorail where the fixture is

going to be mounted.

From the bottom, place the Fusion Jack adapter onto the

2-Circuit Monorail.

Replace and tighten the cap to the Fusion Jack adapter.

Make sure that the cap is not cross threaded.

CAP

FUSION JACK
ADAPTER

2-CIRCUIT MONORAIL

1A

1

1A

2

2

3

4

3

2-Circuit Monorail

1A

1B

5

5

1A

6a

1C

6a

1D

6b

6b

Advertising
This manual is related to the following products: