LBL Lighting MO Telescoping Rigid Standoff User Manual

Telescoping rigid standoffs, Install the ceiling anchor

Advertising
background image

Installation Instructions for

Telescoping Rigid Standoffs

1.3

HANGER-ADJ-_(-BJ)

980MRLTSP

1

Install the Ceiling Anchor

ANCHOR

G

P

I

:

ENERAL

RODUCT NFORMATION

This product is suitable for dry locations only.

This product must be used with LBL Monorail systems only.

This instruction is for the following models:

Monorail Support 2.6" - 4" (HANGER-ADJ-_1)
Monorail Support 6" - 10" (HANGER-ADJ-_2)
Monorail Support 12" - 24" (HANGER-ADJ-_3)
Monorail Support 24" - 48" (HANGER-ADJ-_4)
Monorail Support 48" - 96" (HANGER-ADJ-_5)

Above model numbers with -BJ suffix (vaulted ceilings).

Select a location on the ceiling where the Monorail is to be

mounted.

One way of marking the standoff locations on the ceiling is to

lay the Monorail on the floor underneath of the selected

location and by using a plumb bob pointing on the center of

the Monorail, mark the points on the ceiling.

Another way is to hold the Monorail directly against the ceiling

and mark the standoff points on the ceiling.

Tap the anchors at the marked points up to the threaded

portion with a hammer.

Screw the anchors in the rest of the way with a Phillips

screwdriver.

Insert the #8 screw into the threaded nipple and washer.

Tighten the #8 screw completely into the anchor to secure the

washer and threaded nipple.

Repeat these steps for each standoff.

ANCHOR

WASHER

#8 SCREW

THREADED NIPPLE

CEILING

Monorail

1B

1A

1

2

3

4

6

5

4

6

1B

1A

5

7

1B

1C

Advertising
This manual is related to the following products: