LBL Lighting 2-Circuit MO Adjustable Cable Standoff User Manual

Adjustable cable standoffs, Installing the adjustable cable standoffs

Advertising
background image

Installation Instructions for

Adjustable Cable Standoffs

1.1

HANGER-CBL-_-2

980MR2ASP

1

Installing the Adjustable Cable Standoffs

G

P

I

:

ENERAL

RODUCT NFORMATION

This product is suitable for indoor dry locations only.

This product must be used with LBL 2-Circuit Monorail system only.

This instruction is for the following models:

Adjustable Cable Standoff 6' (HANGER-CBJ-_6-2)
Adjustable Cable Standoff 8' (HANGER-CBJ-_8-2)
Adjustable Cable Standoff 18' (HANGER-CBJ-_18-2)
Adjustable Cable Standoff 25' (HANGER-CBJ-_25-2)

2-Circuit Monorail

ANCHOR

Select a location on the ceiling where the Monorail is to be

mounted.

One way of marking the standoff locations on the ceiling is to

lay the Monorail on the floor underneath of the selected

location and by using a plumb bob pointing on the center of

the Monorail, mark the points on the ceiling.

Another way is to hold the Monorail directly against the ceiling

and mark the standoff points on the ceiling.

Tap the anchors at the marked points up to the threaded

portion with a hammer.

Screw the anchors in the rest of the way with a Phillips

screwdriver.

Insert the #8 screw into the threaded nipple and washer.

Tighten the #8 screw completely into the anchor to secure the

washer and threaded nipple.

Repeat these steps for each standoff.

ANCHOR

WASHER

#8 SCREW

THREADED NIPPLE

CEILING

1B

1A

1

2

3

4

6

5

4

6

1B

1A

5

7

1B

1C

Advertising