LBL Lighting 2-Circuit MO Direct Feed Standoff for Surf Xfmr User Manual

Install the rigid standoffs, Installation instructions for, Circuit monorail

Advertising
background image

Installation Instructions for

1.0

HANGERDIRADJ-_1-2

980MR2SPSMT

1

G

P

I

:

ENERAL

RODUCT NFORMATION

This product is suitable for indoor dry locations only.

This product is intended to be used with LBL Surface Mount

Transformers and 2-Circuit Monorail system only.

Telescoping Rigid Standoff for Surface Mount Transformers

Install the Rigid Standoffs

2-Circuit Monorail

ANCHOR

Select a location on the ceiling where the 2-Circuit Monorail is

to be mounted.

One way of marking the standoff locations on the ceiling is to

lay the 2-Circuit Monorail on the floor underneath of the

selected location and by using a plumb bob pointing on the

center of the 2-Circuit Monorail, mark the points on the

ceiling.

The other way is to hold the 2-Circuit Monorail directly

against the ceiling and mark the standoff points on the ceiling.

Tap the anchors at the marked points up to the threaded

portion with a hammer.

Screw the anchors in the rest of the way with a Phillips

screwdriver.

Insert the #8 screw into the threaded nipple and washer.

Tighten the #8 screw completely into the anchor to secure the

washer and threaded nipple.

Repeat step 4 through 6 for the remaining standoffs.

ANCHOR

WASHER

#8 SCREW

THREADED NIPPLE

CAUTION:

This standoff is not applicable with

vaulted ceilings.

CEILING

1B

1A

1

2

3

4

6

5

4

6

1B

1A

5

7

1B

1C