LBL Lighting 2-Circuit MO Isolating Connectors User Manual

Straight isolating connectors, Install the straight isolating connectors, Save these instructions

Advertising
background image

Installation Instructions for

Straight Isolating Connectors

1.1

ISOCONNECTORCL-M-2

980MR2SIC

1

Push the two 2-Circuit Monorail sections completely onto the

isolating connectors.

2-CIRCUIT
MONORAIL

ISOLATING
CONNECTOR

G

P

I

:

ENERAL RODUCT NFORMATION

This product is suitable for indoor dry locations only.

This product must be used with the LBL 2-Circuit Monorail
system only.

M3 SET SCREW

1.5 MM ALLEN
WRENCH

Tighten the M3 set screws firmly with the provided 1.5 MM

Allen wrench.

the set screws which

Do Not Over Tighten

may strip the thread.

Install the Straight Isolating
Connectors

2-Circuit Monorail

7400 Linder Ave, Skokie, IL 60077

800.323.3226 - 847.626.6300

www.lbllighting.com

© 2014 LBL Lighting.All rights reserved.The "LBL Lighting" graphic is a
registered trademark of LBL Lighting. LBL Lighting reserves the right to
change specifications for product improvements without notification.

A Generation Brands Company

SAVE THESE INSTRUCTIONS!

A Generation Brands Company

1B

1A

1

2

1B

1A

1

2

Advertising