LBL Lighting MO Direct Feed Standoff for Canopy User Manual

Rigid standoff, Install the rigid standoffs, Installation instructions for

Advertising
background image

Installation Instructions for

Rigid Standoff

980MRLSPPFC

1

Install the Rigid Standoffs

ANCHOR

G

P

I

:

ENERAL

RODUCT NFORMATION

This product is suitable for indoor dry locations only.

This product is intended to be used with LBL direct power feed

canopies and Monorail system only.

Select a location on the ceiling where the Monorail is to be

mounted.

One way of marking the standoff locations on the ceiling is to

lay the Monorail on the floor underneath of the selected

location and by using a plumb bob pointing on the center of

the Monorail, mark the points on the ceiling.

The other way is to hold the Monorail directly against the

ceiling and mark the standoff points on the ceiling.

Tap the anchors at the marked points up to the threaded

portion with a hammer.

Screw the anchors in the rest of the way with a Phillips

screwdriver.

Insert the #8 screw into the threaded nipple and washer.

Tighten the #8 screw completely into the anchor to secure the

washer and threaded nipple.

Repeat step 4 through 6 for the remaining standoffs.

ANCHOR

WASHER

#8 SCREW

THREADED NIPPLE

CAUTION:

This standoff is not applicable with

vaulted ceilings.

CEILING

Monorail

1.2

HANGERDIR_

1A

CAUTION - RISK OF FIRE

This product requires installation by a qualified
electrician. Before installing be sure to read all
instructions and TURN THE POWER TO THE
ELECTRICAL BOX OFF.

1B

1C

1

2

3

4

5

6

7

4

6

Advertising