3 unpacking and installation, Unpacking and installation, Instrument setup – Leica Biosystems RM2255 User Manual
Page 18
Advertising
16
Instructions for Use, V 1.8 RevC – 07/2013
4.
Instrument Setup
4.3 Unpacking and installation
Fig. 9
Fig. 10
1
2
3
4
4
4
4
5
•
Loosen and unscrew the six upper
screws (2).
• Remove the cover (1).
• Take the accessory carton (optional
accessories) (3) and the cartons (4)
from the standard scope of delivery.
When the instrument is delivered, check the tilt indicators on the
packaging.
If the arrowhead is blue, the shipment was transported laying flat, was
tilted at too great an angle or fell over during transport.
Note this on the shipping documents and check the shipment for pos-
sible damage.
The transport crate and in-
cluded retaining elements
should be kept in case a re-
turn shipment is necessary
later.
Advertising