4

Installation and Operation

Installing the UPS is as easy as following the steps shown. Be aware the
Power Switch must be kept in the “ON” position, otherwise, the UPS will be
disabled and your equipment will not be protected during a power failure.

1. Inspection
Remove the UPS from its packaging and inspect it for damage that may
have occurred during shipping. If any damage is discovered, repack the
unit and return it to the place of purchase -

2. Placement
Install the UPS unit in any protected environment that provides
adequate airflow around the unit, and is free from excessive dust,
corrosive fumes and conductive contaminants. Do not operate your
UPS in an environment where the ambient temperature or humidity is
high. On the other hand, place the UPS unit away from monitor at least
8 inches to avoid interference.

3. Charging
This unit is shipped from the factory with its internal battery fully
charged, however, some charge may be lost during shipping and the
battery should be recharged prior to use. Plug the unit into an
appropriate power supply and allow the UPS to charge fully by leaving it
plugged in for at least 8 hours.

(RMA) Please inform the

transport agency immediately should you find signs of damage.)

(Please

keep the packaging in a safe place for future use.

+-

8 inches

UTBF

~

~

Advertising