Assembly instructions, Do not remove – Vogelzang TR009 User Manual

Page 5

Advertising
background image

VGZ-029 / 20120113.0

TR009 PERFORMER™ /

Page 5

ASSEMBLY INSTRUCTIONS

TOOLS AND MATERIALS REQUIRED

FOR INSTALLATION

tools

• Pencil
• 6 ft/2m Folding Rule or Tape Measure
• Tin Snips
• Drill: Hand or Electric
• 1/8”/3mm dia. Drill Bit (for sheet metal screws)
• Screwdrivers (blade and Phillips type)
• 10mm Nut Driver or Ratchet with 10mm Socket
• 11/16” socket or wrench
• Safety Glasses
• Gloves

materials

(NOTE: The following items are NOT included with your stove)

Flooring Protection: as specified (see page 7)
Connector Pipe: 6”/152mm dia. minimum 24 MSG black or 26

MSG blue steel straight stove pipe or elbow(s).

1/2”/13mm Sheet Metal Screws
Chimney: Existing 6”/152mm Code-approved Lined Masonry

Chimney or 6”/152mm Inside Dia. UL/ULC Listed Type HT
manufactured chimney.

Furnace Cement (manufacturer recommends Rutland Code 78

or equivalent)

CAUTION: STOVE IS HEAVY. MAKE SURE YOU
HAVE ADEQUATE HELP AND USE PROPER
LIFTING TECHNIQUES WHENEVER MOVING
STOVE.

1. Uncrate the stove and remove all cardboard and

styrofoam packing materials and protective poly
bag. Remove pedestal base, sides, front, top, ash
drawer and ash drawer support from the carton.
(Save packing materials for further assembly.)

NOTICE: DO NOT remove ceramic blanket
material
from inside stove pipe opening (Fig. 1).
This blanket provides an air seal on the side walls

4. Attach the pedestal front frame to the sides. The

pedestal front should go

over (not inside of) the side

panels. Use three (3) machine screws, lockwash-
ers & hex nuts (provided in the hardware pack) on
each side to attach both pedestal sides (#31) to the
pedestal front (#32).

5. Position ash drawer support into assembled ped-

estal (Figure 5) and secure from rear with two
(2) machine screws, lock washers and hex nuts.
Tighten all pedestal hardware.

of the stove to direct combustion gasses over the
secondary combustion tubes before exiting via the
chimney.

DO NOT REMOVE the ceramic blanket

or your stove will not operate properly.

Figure 2 – Pedestal Assembly

Hardware. 1/4-20 machine screws,

lock washers & hex nuts

Figure 3 –

Assemble

sides to base

Figure 4 – Attach Pedestal

Front Frame to Sides.

(Note– front goes OVER

the side panels.)

Figure 1 – DO NOT remove ceramic blanket from

inside stove pipe opening. This is NOT packing

material but an integral component of the stove

combustion system.

NOTICE: Vogelzang International Corp. grants no warranty, stated or implied, for the installation or

maintenance of your wood stove and assumes no responsibility of any incidental or consequential damages.

2. Remove parts and hardware pack located inside

firebox.

3. Align the hole pattern of one of the pedestal sides

to the holes in the base and secure with four (4)
machine screws, lock washers and hex nuts. As-
semble the opposite side to the base. (Note: Sides
are interchangeable.)

continued on next page

DO NOT

REMOVE!

Advertising