Ditch Witch JT2020 User Manual
Page 192
Advertising
JT2020 Mach 1 Operator’s
Manual
Service - 191
As Needed
CMW
Check Saver Sub
Check saver sub and replace as needed. See your Ditch Witch dealer for replacement parts.
To replace:
1.
Remove eight bolts that attach saver sub to spindle. Do not remove indexing dowels from spindle.
2.
Remove and replace o-ring, if necessary.
3.
Install in reverse order and torque eight bolts in a cross pattern to 47 ft•lb (64 N•m). Apply Loctite
®
242
to bolts before installation.
Replace Fuses
Change fuses as needed. Refer to decal inside panels to identify fuses.
Advertising
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)