Lacava llc 4 – Lacava 1495 User Manual

Page 4

Advertising
background image

LACAVA LLC

4

Installation Instructions/Instrucciones de Instalación

3-

1. Prepare the subfloor. Subfloor is a minimum 2” thick

wood support installed between the floor joists

(concrete can may also be used instead).

2. Position and install the subframe so that the top (without

outlet cap) of the rough-in will be flush with the FINISHED

floor.

4. Place the rough-in into position over the mounting bolts.

Use the levelers to make sure the rough-in is completely

level (rough-in must be level to ensure the complete

assembly will be vertical).

5. Secure the rough-in into place using the provided

washers and nuts.

levelers

6. Apply teflon tape to the 1/2”NPT threaded hot & cold

supply lines and then thread into base.

7. Ensure the plug is still tightly installed onto the top of the

brass body and turn on the water supply. Check for

leaks and repair if necessary.

8. Turn water supply off.

H

C

control

handle

hand shower

hook

3. Place the rough-in on the subfloor in desired location and

mark the location of the mounting holes. Note the orientation

of the rough-in relative to where the control handle and

hand-shower hook will be located once the filler is installed.

Mark the holes and install the mounting bolts to the subframe.

7/16”

Advertising
This manual is related to the following products: