Labor Saver Self-Adhesive Mat
System Installation Instructions

(cont.)

2

3

4

5

1

Read and follow the instructions on surface preparation. The mounting surface must be clear of any debris, oil and grease to
ensure proper installation of the safety mat.

Carefully remove the safety mat and/or trim from their shipping cartons. Follow the instructions for unpacking and handling
included with the Larco mat.

Place the mat in the desired location to verify cord location and reference distances. Always use two people to move the mat
into place. Take caution not to damage or prematurely remove the VHB tape backing from the mat or trim prior to installation
by dragging the mat across the floor or any surface.

CAUTION: Avoid walking on mats during placement as the mats may

“creep” out of position.

If VHB tape is pre-applied directly to the mat: Carefully stand or kneel in the center of the mat. Verify that the mat did not
move. With the mat in the desired position, lift the corner of the mat approximately 6” off the prepared surface creating a gentle
bend. Use extreme caution to avoid bending the mat back so far that it would kink or bend the internal electrode causing
permanent non-repairable damage.

Peel the backing off the VHB tape on the exposed end of the mat. When done, lower the mat to the prepared surface. Do not
apply pressure to the edge at this time. Repeat this procedure on the opposite end of the mat. Verify the correct positioning of
the mat and press down on the perimeter of the mat.

If VHB tape is pre-applied directly to the mat trim: With the mat in the desired position, carefully peel backing off the VHB
tape. When done, carefully lower the trim into position on the mat edges. If using lock-lip edge mats, ensure the trim fits into
appropriate lock lip groove on the edge of the mat. Do not apply pressure to the edge at this time. Repeat this procedure for
each piece of trim to bond to the mounting surface.

If the mat was positioned incorrectly, it cannot be moved easily. If the mat needs to be repositioned it must be done immediately
as the VHB tape bond strengthens over time. Each time the mat is lifted and repositioned the bond will be weakened. Remove
the mat carefully lifting one end of the mat or trim approximately 6” and carefully work the edges of the mat or trim up around
the mat. With the mat completely removed from the prepared surface place it in the correct location. Do not slide it, the tape will
roll.

NOTE: The mat can be damaged if tools or pry bars are used to

remove the mat. Bending the mat excessively may damage the internal

components.