Installation overview, Mounting the mgp 464, Tabletop use – Extron electronic Multi-Graphic Processor MGP 464 DI User Manual

Page 16: Rack mounting, Ul guidelines for rack mounting, Ul guidelines for rack mounting -2, Preliminar y, Installation

Advertising
background image

MGP 464 • Installation

2-2

Installation

PRELIMINAR

Y

Installation Overview

The MGP 464 processor can be connected to as many as 19 input devices

simultaneously, and up to two output devices. Follow these steps to install the

MGP 464:

1

Disconnect power to the MGP, and turn off all other devices that will be

connected.

2

If desired, mount the MGP. See “Mounting the MGP 464,” below.

3

Attach video input devices to the MGP 464, using the four sets of BNC

connectors for the fully configurable inputs and/or the 15 BNC connectors for

the virtual inputs.

For the MGP 464 DI, connect up to four input sources to the DVI-I and/or

the BNC connectors as desired. For the MGP 464 HD-SDI, connect up to

four input sources to the two HD-SDI connectors, the two DVI-I connectors,

and/or the four BNC connectors, in any desired combination.

4

Connect one or two output devices to the RGBHV/YUV BNC output

connectors and/or to the DVI-I output connector.

5

If the MGP 464 will be connected to a computer or to a host controller for

remote operation, connect the host’s RS-232 cable to the processor’s 9-pin

RS-232/422 D-sub connector on the rear panel; or use the optional 9-pin

female-to-2.5 mm TRS cable to connect the host to the MGP’s front panel

RS-232 Config port.

6

Connect an active LAN Ethernet cable to the RJ-45 port on the MGP’s rear

panel to establish a link to the network.

7

Power up the input and output devices, then connect power to the MGP.

Mounting the MGP 464

Tabletop use

Four self-adhesive rubber feet are included with the MGP 464. For tabletop use,

attach one foot to each corner of the bottom side of the unit and place the unit in the

desired location.

Rack mounting

UL guidelines for rack mounting

The following Underwriters Laboratories (UL) guidelines pertain to the installation

of the MGP 464 into a rack:

Elevated operating ambient temperature

— If the equipment is installed in

a closed or multi-unit rack assembly, the operating ambient temperature of

the rack environment may be greater than room ambient. Therefore, consider

installing the equipment in an environment compatible with the maximum

ambient temperature (Tma) specified by the manufacturer.

Reduced air flow

— Install the equipment in the rack so that the amount of air

flow required for safe operation of the equipment is not compromised.

Mechanical loading

— Mount the equipment in the rack so that uneven

mechanical loading does not create a hazardous condition.

Advertising
This manual is related to the following products: