Heatiator Heatilator Evolution NEVO4236I NEVO3630I User Manual

Page 44

Advertising
background image

Heatilator • Evolution • 4065-114 Rev. o • 11/11

44

Cut hole 1/8 in. (3 mm) greater
in size than pattern of support
box as it is projected onto
roofline.

2 in. (51 mm)
minimum below
finished ceiling

Cathedral ceiling
support box

Level

F. Install Decorative Ceiling Components
(SLP only)

A decorative ceiling thimble can be installed on a fl at ceil-
ing through which the vent passes. The decorative ceiling
thimble is used to cover the fi restop.

• Seal the gap between the vent pipe and firestop

using high temperature silicone to prevent cold air
infi ltration.

• Install the decorative ceiling thimble by sliding it up to

the ceiling and attaching it using the provided screws.

A decorative cathedral ceiling support box can be used
where vertical vent runs pass through a cathedral ceiling.

• Use a plumb-bob to mark the center line of the venting

system on the ceiling and drill a small hole through the
ceiling and roof at this point. Locate the hole and mark
the outline of the cathedral ceiling support box on the
outside roof.

• Remove shingles or other roof covering as necessary

to cut the rectangular hole for the support box. Cut the
hole 1/8 in. (3 mm) larger than the support box outline.

• Lower the support box through the hole in the roof until

its bottom is at least 2 in. (51 mm) below the ceiling
(Figure 10.12).

• Level the support box both vertically and horizontally

and temporarily tack it in place through the inside walls
into the roof sheathing.

Use tin snips to cut the support box from the top corners
down to the roof line and fold the resulting fl aps to the
roof. See Figure 10.13.

• Nail

the

fl aps to the roof AFTER running a bead of non

hardening sealant between the fl aps and the roof.

WARNING! Risk of Fire!

Clean out ALL materials from

inside the support box and complete the vertical vent run
and termination.

Figure 10.12

Figure 10.13

Advertising