Installation instructions, Install the ductwork, Install the downdraft vent – GE JVB37 User Manual

Page 15

Advertising
background image

15

Installation Instructions

INSTALL THE DUCTWORK

Use minimum 26

″ gauge galvanized or

24 gauge aluminum duct 3

1

4

″ x 10″ or

6

″ round. PVC duct should be used if

installing under a poured concrete slab.

DO NOT USE flexible ducting.

Always use appropriate roof or wall

cap with damper. Laundry type wall
caps should never be used. See the
Ductwork Length and Duct Fittings
chart.

Use the straightest duct run possible.

For satisfactory performance the duct

run should not exceed 150 feet or its
equivalent length when bends or
various fittings are used. Refer to the
table of equivalent lengths to calculate
your installation.

Install ductwork so the piece of duct

nearest the downdraft unit slots INTO
the next piece of the duct. Secure the
joints with self-tapping screws and
apply duct tape around the joints to
ensure an airtight seal.

2

INSTALL THE DOWNDRAFT VENT

Place the downdraft vent into the
countertop cutout, against the back side.

Secure the downdraft to the countertop

supplied brackets. See illustration.

Fasten 2 brackets to vent side and secure

to cabinet back wall.

Install 2 brackets on the bottom of the

vent. Attach brackets to slide screws on
the vent and to the floor using wood
screws (not supplied).

When installing in a tile countertop
surface, it may be necessary to apply
a locally approved caulking to cover
any gaps.

C

B

A

1

Airflow

Screw

Duct tape over
seam and screw

Secure the lower brackets

to blower housing

Preferred
method

Secure
the upper
brackets
with screws
located on
the side
of case
and attach
to back of
cabinet

Advertising
This manual is related to the following products: