Installation instructions, Preparing the opening, A2 a1 – GE JGP321 User Manual

Page 16

Advertising
background image

A2

A1

The following MINIMUM clearance
dimensions must be maintained.

A3

To insure accuracy, it is best to make
a template when cutting the opening
in the counter.

A4

The recommended Gas Supply
Location from the backwall.

Overall cooktop dimensions

Cutout dimensions

of the countertop

16

Installation Instructions

A5

Make sure the wall coverings,
countertop and cabinets around the
cooktop can withstand heat (up to
200°F) generated by cooktop.

Wall covering,
cabinets and
countertop
must withstand
heat up to 200°F.

COOKTOP

30 1/4"

21 1/4"

19 1/2"

28 3/4"

3 9/16"

1 3/4" Min.

Between cutout

and the wall behind

the cooktop

19 5/8" width of cut

28 1/2"

length of

cut

3 1/4" Min.

from front edge

of cutout

and front edge

of countertop

14 1/4"

3 3/4" MIN.
clearance from
cutout to side
wall on the left
of the unit

30" MIN.
clearance from
countertop to
unprotected
overhead surface

3 3/4 MIN.
clearance from
cutout to side
wall on the right
of the unit

13" MAX. Depth
of unprotected
overhead cabinets

18" MIN.
height from
countertop to
nearest cabinet on
either side of unit

12 1/2"

From Cutout
Center Line

1" Min. From Backwall

Recommended
gas supply
location.

PREPARING THE OPENING

A

Advertising
This manual is related to the following products: