Marantz VP-12S2 User Manual

Page 35

Advertising
background image

ENGLISH

31

8.

Holding the handle and pull the lamp unit out toward your
side.

9.

Install a new lamp unit in position securely.

10.

Tighten the two screws of the lamp unit. Push and fold
the handle.

11.

Install the lamp cover back in its original position and
fasten with the fastening screw.

12.

Plug in the video projector and turn on the power and
project the image. Reset the Lamp Life. (

P.26)

If the lens becomes dirty or smudged, clean it with a soft
dry cloth only. Use optical lens cleaners that are approved
for eyeglasses or cameras. Do not use a dampen cloth,
detergent solution, or thinner. It may damage the lens and
remain as stains.

When replacement parts are required, be sure to inform a
Marantz authorized service center. Use only replacement
parts specified by Marantz. Unauthorized substitutions
may result in fire, electric shock, or other hazards. And,
the warranty may not be guaranteed.

• Lamp Unit

: LU-12VPS1

• Ceiling Mount kit

: MOUNT 12

This kit is specially designed to mount the unit on ceiling.

• Extension Pole

: EXT-81

This tool is to adjust height with the Ceiling Mount Kit
MOUNT 12.

CAUTION:

For ceiling installation, consult with the Marantz Authorized
dealer.

Optional Accessories

Replacement Parts

Cleaning the Lens

(b)

(a)

Lamp unit

Advertising