Motorola BR700 User Manual
Page 17
![background image](/manuals/122470/17/background.png)
SECTION 2
INSTALLATION
2-4 SECTION
2,
INSTALLATION
2 Click the Print icon or choose Print from the File menu to display
the Print dialog box:
Be sure you print the template at 100% scale and that Fit to page is
not checked in the Print dialog box.
3 Click OK.
4 Measure the printed template with a ruler to ensure that it is the
correct size.
5 Use a center punch to mark the center of the holes on the wall.
6 On the wall, locate the marks for the mounting holes you just
made.
WARNING!
Before drilling holes, check the structure for potential
damage to water, gas, or electric lines.
7 Drill the holes to a depth of at least 3.8 cm (1½ inches).
8 If necessary, seat an anchor in each hole. Use M5 x 38 mm
(#10-16 x 11/2 inch) screws with a flat underside and maximum
screw head diameter of 10.5 mm to mount the router.