Indicator-related symptoms, Power-related symptoms – IBM THINKPAD S05L-1270-01 User Manual

Page 158

Advertising
background image

Symptom / Error

FRU / Action in Sequence

TrackPoint III does not
work.

1. Reseat the keyboard

cable on the system
board.

2. Go to “TrackPoint III

Checkout” on
page 130.

3. Keyboard
4. System board

Pointer moves automatically
or does not work correctly.

See “TrackPoint III
Checkout” on page 130.

Indicator-Related Symptoms

Symptom / Error

FRU / Action in Sequence

Indicator incorrectly remains
off or on, but system runs
correctly.

System board

DC/DC card

Battery power status
indicator blinks from green,
yellow, to orange.

1. Check that a correct

battery is installed.

2. Battery pack
3. DC/DC card
4. System board

Battery indicator does not
turn on when the battery is
installed.

c.

DC/DC card

Battery pack

System board

Power-Related Symptoms

Symptom / Error

FRU / Action in Sequence

Power shuts down during
operation.

1. Go to “Power

Systems Checkout”
on page 131.

2. Battery pack

3. Remove the battery

pack and let it cool for
2 hours.

4. DC/DC card
5. System bard
6. Power sources

The system does not power
off.
(See “Power Shutdown
Switch” on page 126.)

1. Press the power

shutdown switch.

2. DC/DC card
3. System board

146

IBM Mobile Systems HMM

Advertising