English, Preparation of chassis, Wp series – LG L1004R User Manual
Page 21
21
ENGLISH
11
14
Shipping
Screws
DE
FR
OS
T
HE
AT
CO
OL
IND
OO
R
DE
SIR
ED
EN
ER
GY
SA
VE
R
AIR
PU
RY
FIE
R
AU
TO
RE
STA
RT
FA
N
FA
N
DR
Y
DE
FR
OS
T
HE
AT
CO
OL
IND
OO
R
DE
SIR
ED
EN
ER
GY
SA
VE
R
AIR
PU
RY
FIE
R
AU
TO
RE
STA
RT
FA
N
FA
N
DR
Y
(Type A)
5
(Type A)
1
2
3
4
5
6
7
8
9
10
11
15
12
14
5
15
13
Upper guide
Upper guide
Installation Kits Contents
Suggested Tool Requirements
NO.
NAME OF PARTS
Q'TY
1
FRAME CURTAIN
2
2
SUPPORT BRACKET
2
3
SILL BRACKET
2
4
LOCK NUT
4
5
SCREW (TYPE A)
14
6
SCREW (TYPE B)
7
7
SCREW (TYPE C)
5
8
SCREW (TYPE D)
2
9
CARRIAGE BOLT
2
10
FOAM STRIP
1
11
FOAM SEAL
1
12
WINDOW LOCKING BRACKET
1
13
DRAIN PIPE
1
14
FOAM-PE
1
15
FRAME GUIDE
2
PREPARATION OF CHASSIS
Remove the screws which fasten the cabinet at both
sides and at the back.
Slide the unit from the cabinet by gripping the base pan
handle and pulling forward while bracing the cabinet.
Cut the window sash seal to the proper length.
Peel off the backing and attach the Foam-Seal
to the
underside of the window sash.
Remove the backing from the top upper guide Foam-PE
and attach it to the bottom of the Upper Guide.
Attach the upper guide onto the top of the cabinet with 3
Type A screws
.
Insert the Frame Guides
into the bottom of the
cabinet.
Insert the Frame Curtain
into the Upper Guide and
Frame Guides
.
Fasten the curtains to the unit with 10 Type
A screws
.
8
7
6
5
4
3
2
1
SCREWDRIVER(Philips and Flatead), RULER, KNIFE, HAMMER, PENCIL, LEVEL
WP Series