Rear panel, Initial setup, Rear panel -5 – NETGEAR ReadyNAS 2100 User Manual
Page 15: Initial setup -5

ReadyNAS 2100 User Manual
Getting Acquainted
1-5
v1.1, June 2009
Rear Panel
1. System exhaust fans.
2. Power on off switch.
3. Power cable socket.
4. Disk exhaust fans.
5. Two USB ports.
6. LAN1 and LAN2 gigabit Ethernet ports.
Initial Setup
Follow the instructions in the NETGEAR Installation Guide that came with your unit to install it.
An electronic copy of the installation guide is on the product CD, on the NETGEAR web site, and
on
http://readynas.com
.
The initial setup estimated completion time is 20 minutes.
Appendix B, “Share Access from MAC and Linux Systems”
shares from Linux and various versions of the MAC OS.
Figure 1-4
Note: A diskless unit requires installing disks and initializing RAID before proceeding.
for a list of supported disks. Refer to
the Boot Menu to Format a RAID Volume” on page 5-14
installing disks and configuring RAID.
3
4
6
5
1
2