Nortel Networks 50 Series User Manual

Bes50, Before you start, Mounting options

Advertising
background image

Steps 1 3

Before you

start

Steps 4 10

Mounting Options

Steps 11 13

Powering up

Steps 14 21

Initial Access and

Configuration

!

Perform steps 11 and
12 in the order listed.

BES50

Business Ethernet Switch 50 Series
Quick Install Guide

You can download all documents

referenced in this Quick Install guide at

www.nortel.com.

12

11

10

8

9

1

3

4

5

6

2

7

13

14

15

16

17

18

19

20

21

2. Confirm that you have the tools and

package contents as follows:

Tools Required:

a. Phillips or flathead screwdriver, depending

on the type of screws used.

Package contents:

b. BES50FE-12/24T PWR or

BES50GE-12/24T PWR switch

c. Adhesive foot pads (4)

d. AC power adapter

3. Check your cables; when you install

the switch into a network make sure you

use the following required cables:

• Category 3 UTP or STP cables with an RJ-45 connector

(for 10BASE-T ports).

• Category 5 UTP or STP cables with an RJ-45 connector

(for 100BASE-TX ports).

• Category 5, 5e, or 6 UTP or STP cables with an RJ-45

connector (for 1000BASE-T ports).

4. If you mount a BES50 unit on a desktop or shelf,

attach the supplied rubber feet to the bottom of the

unit. If the BES50 system includes additional units,

you can set the additional units beside, or stack

them on top of, the first unit.

The BES50FE12/24T and BES50GE12/24T switch units can be

mounted horizontally on a flat surface and stacked with a BCM50.

1. Download the Business Element

Manager 1.0 Installer to a

computer on your network. You

install the Element Manager in

Step 16.

5. If you are mounting the additional units

beside the first unit, attach the supplied

rubber feet to the bottom of each unit.

6. If you are stacking the additional units on top of

the first unit, mount each unit into the tabs on top

of another unit.

8. To install a BCM50 unit on top of a BES50 unit, place

the BCM50 unit on top of the BES50.

a. Set the device on a flat surface near an AC power source, making

sure there are at least two inches of space on all sides for proper air flow.

b. If you install multiple switches, attach four adhesive feet to each one.

Place each device squarely on top of the one below, in any order.

9. Make sure the feet of the BES50 are in the slots

on the top of the BCM50 unit and in front of the slots

10. Slide the unit back until it clicks in place on

the slots.

12. Plug the other end

of the power adapter

into a grounded, 3-pin

socket, AC power

source.

11. Insert the power adapter

into the DC power socket in the

front of the switch.

14. To access the BES50, first install the Business Element

Manager 1.0. Refer to Element Manager documentation at

www.nortel.com for instructions.

15. Start the Element Manager.

16. From the Element Manager

menu, choose

Network > Find

Network Elements > Business

Ethernet Switch.

17. Enter the range

192.168.1.1 to

192.168.1.255 and then

click

OK.

Note: By default the

Read Community is

“PlsChgMe!RO” and the

Write Community is

“PlsChgMe!RW”.

18. Select the BES device from the list of

network elements on the Element Manager

tree.

19. Click the Web Page button on the

Element Manager menu.

20. Enter the default username

(nnadmin) and password

(PlsChgMe!) to log on to the

BES50.

21. From the main menu, choose Administration > Quick Start. The

Quick Start screen appears showing the IP address and other items that

you can optionally configure. If you want to manually assign IP addresses,

refer to Using the Nortel Business Ethernet Switch 50 at www.nortel.com.

13. Check the front-panel LEDs as the device

powers on to confirm that the PWR LED is green.

If not, check that the power cable is correctly

plugged in.

Refer to Using the Nortel Business Ethernet Switch 50

at www.nortel.com for detailed installation

instructions.When you connect a PC directly to the

BES50, use the default IP address 192.168.1.128

You are now ready to use the BES50 series switch in

your network installation.

N0128198

BES50-FE/GE-24T PWR switch

BES50-FE/GE-12T PWR switch

RJ-45 Ports with PoE

The BES50 series switch performs a short self-test

as soon as you connect the switch to the power

supply. The status LED will flash green during the

self-test, then solid green when finished. If the

Status LED turns off, the device is not working

correctly. When the self-test finishes, the BES50

starts switching data.

7. If you mount the switch on a

desktop or flat surface, attach the

four adhesive feet to the device as

indicated.

RJ-45 Ports with PoE

System Indicators

Port/PoE Status Indicators

System Indicators

Port/PoE Status Indicators

RJ-45 Ports

Slots

Feet

C

M

Y

CM

MY

CY

CMY

K

BES50_QuickInstallGuide4.pdf 9/13/2006 3:12:23 PM