Installation, Venting arrangements, Vent guard - if required – Regency Liberty L676 User Manual
Page 15: Wall thimble, Vinyl siding standoff, Inst alla tion
Regency
®
L676 Direct Vent Gas Fireplace
15
INST
ALLA
TION
8” dia.
Flue pipe
5” dia. flue pipe
spring spacer
Termination Cap
AstroCap XL
TM
(Part #946-623/P)
Vent Guard - if required*
(Part #946-506/P)
Wall Thimble
(Mandatory in all
Horizontal Terminations)
Vinyl Siding
Standoff
VENTING ARRANGEMENTS
HORIZONTAL TERMINATION (FLEX)
Regency
®
Direct Vent System
These venting systems, in combination with the L676, have been tested and listed as a direct vent heater system by Warnock Hersey. The location
of the termination cap must conform to the requirements in the Vent Terminal Locations diagram from the "Exterior Vent Termination Locations"
section.
FPI Direct Vent (Flex) System Termination Kits include all the
parts needed to install the L676 using a fl exible vent.
Notes:
1) Liner sections should be continuous
without any joints or seams.
2) Only Flex pipe purchased from FPI may
be used for Flex installations.
3) Horizontal vent must be supported every
3 feet.
4) A wall thimble is mandatory for all
horizontal terminations due to high
temperatures.
INSTALLATION
FPI Kit #
Length
Contains:
#946-618
6 Feet
1)
8” fl exible liner (Kit length)
2)
5” fl exible liner (Kit length)
3) spring
spacers
(3)
4) thimble
(2)
5)
AstroCap termination cap (1)
6) screws
(12)
7)
tube of Mill Pac (1)
8) plated
screws
(8)
9)
S.S. screws #8 x 1-1/2” drill point, (4)
10) vinyl siding standoff
#946-616
10 Feet
* A Vent Guard is required when the AstroCap
is installed above grade at 7 feet or lower.