Installation, Venting arrangements, Vent guard - if required – Regency Liberty L676 User Manual

Page 15: Wall thimble, Vinyl siding standoff, Inst alla tion

Advertising
background image

Regency

®

L676 Direct Vent Gas Fireplace

15

INST

ALLA

TION

8” dia.

Flue pipe

5” dia. flue pipe

spring spacer

Termination Cap

AstroCap XL

TM

(Part #946-623/P)

Vent Guard - if required*

(Part #946-506/P)

Wall Thimble

(Mandatory in all

Horizontal Terminations)

Vinyl Siding

Standoff

VENTING ARRANGEMENTS

HORIZONTAL TERMINATION (FLEX)

Regency

®

Direct Vent System

These venting systems, in combination with the L676, have been tested and listed as a direct vent heater system by Warnock Hersey. The location
of the termination cap must conform to the requirements in the Vent Terminal Locations diagram from the "Exterior Vent Termination Locations"
section.

FPI Direct Vent (Flex) System Termination Kits include all the
parts needed to install the L676 using a fl exible vent.

Notes:

1) Liner sections should be continuous

without any joints or seams.

2) Only Flex pipe purchased from FPI may

be used for Flex installations.

3) Horizontal vent must be supported every

3 feet.

4) A wall thimble is mandatory for all

horizontal terminations due to high
temperatures.

INSTALLATION

FPI Kit #

Length

Contains:

#946-618

6 Feet

1)

8” fl exible liner (Kit length)

2)

5” fl exible liner (Kit length)

3) spring

spacers

(3)

4) thimble

(2)

5)

AstroCap termination cap (1)

6) screws

(12)

7)

tube of Mill Pac (1)

8) plated

screws

(8)

9)

S.S. screws #8 x 1-1/2” drill point, (4)

10) vinyl siding standoff

#946-616

10 Feet

* A Vent Guard is required when the AstroCap
is installed above grade at 7 feet or lower.

Advertising