Raypak 240692 User Manual

Page 10

Advertising
background image

WATER TEMPERATURE SENSOR INSTALLATION

HYDRONIC INSTALLATIONS

Fig. #9496

TYPICAL WATER SENSOR

The water sensor should be installed in the system supply.

Locate the water temperature sensor in the system piping just prior to the first boiler connections, on the
upstream side of the System Supply Loop.

Cable length must not exceed 300 feet.

Install in shielded conduit with no other wiring.

Observe wire colors.

10

Advertising