Figure 2–2 – Texas Instruments TPA0202 User Manual

Page 14

Advertising
background image

Quick Start List for Platform

2-4

Quick Start

-

Evaluation Module Preparations

Figure 2–2.

Module Preparation

GND

ROUT+

HP/L*

ROUT–

SE/BTL*

S7

MUTE

GND

LOUT–

LOUT+

S2

C5

C4

R1

R3

C1

C2

C12

LVDD

GND R5

GND

GND

LIN

LHP

C3 R4

R2

C10

C9

RVDD

GND

C8 R9

R7

R10

R8

C7

C6

RHP

RIN

GND

GND

R12

R13

S3

S4

S5

S6

R11

C11

+

D1

TPA0202 SAMPLE EVM

Lit.# SLOP202

U1

S1

+

S8

11

12

13

14

15

16

11) To have the module amplifier IC enter the shutdown mode when the

module mute control input is activated, set shutdown jumper S1 to

ON. To

have the amplifier IC only mute when the module mute control input is
activated, set shutdown jumper S1 to

OFF.

12) To select the line inputs, set input select jumper S3 to

OFF. To select the

headphone inputs, set input select jumper S3 to

ON.

13) To allow the module SE/BTL control input to switch the amplifier IC

between single ended (SE) and bridge-tied load (BTL) output modes, set
output mode jumper S4 to

OFF. To keep the module amplifier IC in the

single-ended output mode regardless of the control input state, set jumper
S4 to

ON.

14) Set V

DD

bridge jumper S5 to either

ON or OFF for normal operation.

15) To automatically select the headphone inputs when the single-ended

output mode is selected by the module SE/BTL control input, set
autosense control jumper

S6 to ON. To isolate the amplifier IC input select

pin from the module output mode select control input, set autosense
control jumper

S6 to OFF.

16) Set junction temperature measurement jumper S8 to

OFF for normal

operation.

Table 2–4. Typical TPA0202 EVM Jumper Settings

EVM

S1

S3

S4

S5

S6

S8

TPA0202

ON

OFF

OFF

ON

ON

OFF

Note:

S8 should remain open at all times, ON = shunt installed, OFF = open

-

Power Up

17) Verify correct voltage and input polarity and set the external power supply

to

ON. If V

CC

and an on-board regulator EVM are used to provide V

DD

, set

platform power switch S1 to

ON.

Platform LED2 should light indicating the presence of V

DD

, and the evaluation

modules installed on the platform should begin operation.

18) Adjust the signal source level as needed.

Advertising