Step 1, Step 2 step 3 step 6 step 9 – Banks Power DynaFact pillar-style gauge mount '99-03 Ford 7.3L Power Stroke Trucks User Manual

Page 5

Advertising
background image

96414 v.1.0

5

6.

Test fit the gauge pod with the

gauge installed on the A-pillar to
ensure clearance for gauge lines and
housing. See

figure 3.

7.

Run gauge lines out through the

firewall toward the engine.

8.

Install the gauge pod and A-pillar,

ensuring that lines are not pinched.

STEP 1

A-PILLAR MOULDING

STEP 2

STEP 3

STEP 6

STEP 9

Figure 3

Advertising