Step 1, Step 2 step 3 step 6 step 9 – Banks Power DynaFact pillar-style gauge mount '99-03 Ford 7.3L Power Stroke Trucks User Manual
Page 5
Advertising
96414 v.1.0
5
6.
Test fit the gauge pod with the
gauge installed on the A-pillar to
ensure clearance for gauge lines and
housing. See
figure 3.
7.
Run gauge lines out through the
firewall toward the engine.
8.
Install the gauge pod and A-pillar,
ensuring that lines are not pinched.
STEP 1
A-PILLAR MOULDING
STEP 2
STEP 3
STEP 6
STEP 9
Figure 3
Advertising