Flashing installation – Grain Systems Bin Flooring PNEG-1830 User Manual
Page 22
Advertising
5. Flooring - Planks
22
PNEG-1830 54' Dura-Lok Plank and Support Manual
Figure 5B Splice Assembly View
Flashing Installation
Figure 5C
Formed Flashing Installation
If bin sweep auger is to be used, overlap flashing such that rotation (usually clockwise) of the sweep will
climb up on the next flashing section. (See detail C in
.) This will prevent the rotating/slipping
outer wheel of the sweep from catching on the flashing edges.
After the floor is in place, lay the flashing pieces on top of the floor place over the 1-1/4" bin bolts.
to determine the correct sequence for placing the nuts and
washers. Finger tighten the nuts. While holding flashing flat, fasten the flashing to the floor with sheet
metal screws. Now tighten flashing nuts.
Advertising